CIVIC CENTRE HIGH STREET UXBRIDGE
Proposal:
Installation of 2no. Air Source Heat Pumps (ASHPs) on the cooling tower roof, 1no. ASHP on the chimney roof with one thermal buffer, and 4no. ASHPS within the service yard surrounded by a 2.1m high, red metal louvre fencing and one thermal buffer. Replacement of existing timber beams and roof covering of the cooling tower roof. Installation of 9 steel beams to reinforce the existing steel frame in the plant room beneath the roof. On the chimney roof, the paving slabs and stilts will be removed to offset the load of the ASHP and thermal buffer on the supporting roof structure. Installation of secondary glazing and cavity wall insulation.
| Status | Approval |
| Ward | Uxbridge 2022 |
| Case Officer | Emilie Bateman |
| Received | 18th Oct 2023 |
| Validated | 18th Oct 2023 |
| Target Decision | 20th Dec 2023 |
| Decided Date | 20th Dec 2023 |