Recently Decided
46 STORMOUNT DRIVE HAYES UB3 1RQ
Part single; part two-storey side and rear extension; removal of front porch and rendering of the entire property (following removal of existing metal panels).
65 CASTLETON ROAD RUISLIP HA4 9QH
Erection of single storey extension to rear and front porch (Application for a Certificate of Lawful Development for a Proposed Development)
34 REGENT AVENUE HILLINGDON UB10 9AN
Front porch extension, with a single storey side extension, conversion of existing side storey into an extension, with a single storey rear extension
47 NORTH VIEW EASTCOTE PINNER
Conversion of integral garage to habitable accommodation and erection of single storey extension to the side and rear
4 HILLSIDE CRESCENT NORTHWOOD
Erection of a single storey front extension, conversion of the garage to habitable room, and amendment to rear steps and rear doors
THE GEORGE HARVESTER BURY STREET RUISLIP
Refurbishment of restaurant including removal of existing and installation of new kitchen extract/intake ductwork, removal of existing and erection of new external timber pergola and construction of brick pillars/planters to car park entrance, changes to exterior materials, and resurfacing.
5 COPSE WOOD WAY NORTHWOOD
Details pursuant to the discharge of Condition 4 (External materials and finishes) of planning permission ref. 52531/APP/2022/953, dated 01-09-2022 (Remodelling of existing dwelling to create a two storey 3-bed dwelling)
43 ST MARY'S ROAD HAYES
Conversion of roof space to habitable use to include a rear dormer, hip to gable extension, gable end window and 2 front roof lights (Application for a Certificate of Lawful Development for a Proposed Development)
254 LONG LANE HILLINGDON
Use of part of ground floor as 2 studio flats (Application for a Certificate of Lawful Development for an Existing Use)
13 FOXDELL NORTHWOOD HA6 2BU
Variation of Condition 2 (approved plans) of planning permission ref. APP/R5510/D/22/3298539, dated 24-08-2022 (72654/APP/2021/3320 - Erection of a part single, part two storey side extension, part garage extension, removal and replacement of existing hipped roof with new hipped crown roof. 1 rear dormer window, 3 front roof lights, 1 side rooflight and new external openings to ground and first floors.) to increase the crown roof, alterations to front roof lights and 2 no. additional rear dormers
CROWN TRADING ESTATE CLAYTON ROAD HAYES
Details pursuant to the partial discharge of Condition 19 (Construction Environmental Management Plan) in relation to the Demolition Phase only of planning consent reference 73955/APP/2021/3362 dated 20-01-2022 for 'Section 73 application to vary Conditions 2 and 3 of application reference 73955/APP/2020/139 (Demolition of existing buildings for residential-led mixed use development comprising buildings between 3 and 11 storeys to provide residential units (Use Class C3) and ground floor employment floorspace (Use Class B1) with associated access and car and cycle parking, landscape and amenity areas and associated servicing) to link internal corridors, relocate the consented gym use, relocate a duplex unit, change duplex units to single level, amend the refuse strategy and amend the layout of the car park & cycle stores'.
9 IVY HOUSE ROAD ICKENHAM
Conversion of loft space to habitable accommodation to include a rear dormer, 2 front and 1 side roof lights. Removal of rear chimney.
AREA OF ICKENHAM GREEN, SOUTH WEST OF THE GREENWAY ICKENHAM
Details of records of the arboricultural site inspections / meetings, in part compliance with Condition 4 (Part 3) of planning permission ref: 44457/APP/2021/2212, dated 18-10-2021 (Sewer diversion works including temporary modifications to the existing construction access adjoining Ickenham High Road; temporary working and welfare compounds; temporary access track; and a temporary bridge for a watercourse crossing).
Land at Bulls Bridge Industrial Estate NORTH HYDE GARDENS HAYES UB3 4QQ
Non-Material Amendment to planning permission ref: 75111/APP/2020/1955, dated 15-04-2021, (Site clearance and preparation, including the demolition of remaining buildings, and the redevelopment of the site to provide: a new data centre (Use Class B8), two MV Energy Centres (including stand-by generation plant and gas storage), a HV Sub-Station, a visitor reception centre, plant, the creation of a new footpath and cycleway link to the canal towpath, works to the highway, car parking, cycle parking, associated infrastructure, enclosures and necessary physical security systems, hard and soft landscaping (including works to the River Crane) and ancillary uses, as well as associated external works) in order to: 1) Amend the description of development; 2) Amend Conditions 2 (Accordance with Approved Plans), 8 (Materials and Details), 9 (Landscape Scheme), 10 (Green Roofs and Walls), and 16 (Sustainable Water Management); and 3) Remove Conditions 7 (Bus Depot/Garage), 11 (Canal Access Ramp Details), 28 (Emission Mitigation Strategy), and 29 (Gas Fired Back-Up Generator Mitigation).