Status: Undecided
34 PEPYS CLOSE ICKENHAM UB10 8NY
Erection of part single storey, part two storey front extension, and a front porch, following demolition of existing attached front garage. Conversion of the roof space into habitable use to include a rear dormer, 3 x front facing roof lights and 1 x rear facing roof light, and relocation of vehicular crossover.
4 PRIORY AVENUE HAREFIELD
Erection of two storey side extension, single storey rear and front extension, following the demolition of an existing garage to the side and rear conservatory.
80 BUSHEY CLOSE ICKENHAM
Erection of two storey rear, side and front extension, 3 x roof lights, amendments to fenestration, following demolition of existing side extension.
4 ALMOND AVENUE ICKENHAM MIDDLESEX
Erection of a single storey side & part single, part double storey rear extension and Enlargement of loft space to form habitable accommodation including 2 side dormers.
100 COPTHALL ROAD WEST ICKENHAM UB10 8HT
Conversion of roof space to habitable use to include rear dormer, side dormer, and hip to gable end extension. (Application for a Certificate of Lawful Development for a Proposed Development)
152 SWAKELEYS ROAD ICKENHAM
Erection of part single storey, part double side and rear extension, conversion of existing outbuilding to habitable use.
71 THORNHILL ROAD ICKENHAM
Part demolition of existing bungalow to extend to side and rear with a two storey extension. Including part single storey, part two storey extensions to the front, side and rear, and amendments to fenestration. Including an air source heat pump and solar panels.
2 HIGHFIELD DRIVE ICKENHAM
Erection of a two storey, 6-bed detached dwelling with habitable roof space, 2 x rear dormers with associated parking and amenity space and installation of vehicular crossover to front.
BROADWATER LAKE MOORHALL ROAD HAREFIELD
Redevelopment of the site to create the Hillingdon Watersports Facility and Activity Centre including demolition of existing Broadwater Lake Sailing Club (BSC) clubhouse at the north of the lake and erection of a building including changing facilities, meeting rooms, storage, Workshop and seasonal worker accommodation (sui generis), activity shelters; installation of pontoons and slipways; boat shed; equipment storage huts; boat parking and racking areas; camping area; outdoor activity areas; ecological enhancement throughout the site; new pedestrian routes through the peninsula; landscaping including new woodland, dense vegetation screens and boundary treatment; access road; localised dredging and land reclamation; relocation of existing sailing area and creation of floating reedbeds within the lake; coach drop off and turning area; vehicle parking; cycle parking; and associated works. (Re-consultation following submission of amended plans and documents)