Home Decisions Meetings News
← Main Dashboard

Emerging Planning Patterns

Summary: This dashboard provides automated tracking of emerging trends within the London Borough of Hillingdon's planning database, identifying phrases and development types that are appearing significantly more often than they have historically.


The system operates by comparing the vocabulary used in applications from the last six months against a historical baseline dating back to May 2022. Using frequency analysis, it calculates a 'Spike Score' for unique phrases, with mathematical smoothing applied to brand-new terms to provide realistic comparisons. This multi-year baseline allows us to distinguish between standard cyclical development and genuine new arrivals in the planning landscape.

To ensure results are meaningful, the logic filters out administrative planning jargon and merges synonyms, requiring a pattern to appear in at least three unique applications before it is surfaced as a noteworthy trend. This rigorous filtering ensures that only genuine shifts in activity are presented.

By surfacing these patterns, the tool provides a neutral overview of coordinated rollouts—such as telecommunications hubs—and shifts in residential trends like specific types of garage conversions or environmental upgrades. This analysis focuses purely on statistical deviations from normal activity, allowing residents and stakeholders to observe trends as they develop. This ensures that high-frequency planning shifts remain visible even when they are spread across multiple different wards, helping to provide a borough-wide perspective on how Hillingdon is changing.

Pattern: “innovation”

Frequency: 100× higher than normal
Hayes Bridge Retail Park and Heathrow Interchange UXBRIDGE ROAD HAYES UB4 0RH
WOOD END 2022 Validated: 11th Aug
Undecided
Details pursuant to the discharge of Condition 16 (Phase 1: LON6 - Construction Environmental Management and Logistics Plan) and 46 (Phase 2: Innovation Hub - Construction Environmental Management and Logistics Plan) of planning permission ref. 78343/APP/2025/719, dated 20.05.2026 (Hybrid planning application for a four-phased redevelopment to deliver a data centre campus comprising of: Phase 1 - Full planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) site access and internal roads including a vehicular and pedestrian link between Uxbridge Road and Bullsbrook Road; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development; Phase 2 - Outline planning permission for (a) an Innovation Hub; (b) hard and soft, green and blue, infrastructure; and (c) other ancillary and auxiliary forms of development (all matters reserved); Phase 3 - Outline planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) internal roads; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development (all matters reserved); and Phase 4 - Outline planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) internal roads; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development (all matters reserved).)
Hayes Bridge Retail Park and Heathrow Interchange UXBRIDGE ROAD HAYES UB4 0RH
WOOD END 2022 Validated: 30th Jul
Undecided
Details pursuant to the discharge of Conditions 21 (Phase 1: LON6 - District Heating Network) and 51 (Phase 2: Innovation Hub - District Heating Network) of planning permission ref. 78343/APP/2025/719, dated 20.05.2026 (Hybrid planning application for a four-phased redevelopment to deliver a data centre campus comprising of: Phase 1 - Full planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) site access and internal roads including a vehicular and pedestrian link between Uxbridge Road and Bullsbrook Road; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development; Phase 2 - Outline planning permission for (a) an Innovation Hub; (b) hard and soft, green and blue, infrastructure; and (c) other ancillary and auxiliary forms of development (all matters reserved); Phase 3 - Outline planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) internal roads; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development (all matters reserved); and Phase 4 - Outline planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) internal roads; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development (all matters reserved).)
Hayes Bridge Retail Park and Heathrow Interchange UXBRIDGE ROAD HAYES UB4 0RH
WOOD END 2022 Validated: 30th Jul
Undecided
Details pursuant to the discharge of Condition 20 (Phase 1: LON6 - Water Infrastructure Details) and 50 (Phase 2: Innovation Hub - Water Infrastructure Details) of planning permission ref. 78343/APP/2025/719, dated 20.05.2026 (Hybrid planning application for a four-phased redevelopment to deliver a data centre campus comprising of: Phase 1 - Full planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) site access and internal roads including a vehicular and pedestrian link between Uxbridge Road and Bullsbrook Road; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development; Phase 2 - Outline planning permission for (a) an Innovation Hub; (b) hard and soft, green and blue, infrastructure; and (c) other ancillary and auxiliary forms of development (all matters reserved); Phase 3 - Outline planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) internal roads; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development (all matters reserved); and Phase 4 - Outline planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) internal roads; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development (all matters reserved).)
View all 5 applications for this pattern →

Pattern: “pumphouse”

Frequency: 47× higher than normal
UNIT 4, SILVERDALE INDUSTRIAL ESTATE SILVERDALE ROAD HAYES
HAYES TOWN 2022 Validated: 10th Jun
Approval
Details pursuant to the discharge of Condition 19 (Detailed Landscape Scheme) of planning permission ref. 49261/APP/2024/2904 dated 12-03-2026 (Demolition of the existing building and structures on site, and all other associated site clearance works. Construction of a data centre building (Class B8) with plant at roof level with an emergency generator (1no.) and associated flue (provided within an external compound adjoining the data centre building), sprinkler tank and pumphouse, security guard house, and provision of one kiosk substation and MV Building. The development also comprises the construction of a new access and internal road and circulation areas, footpaths, provision of car and bicycle parking, hard and soft landscaping and other associated works and ancillary site infrastructure.)
UNIT 4, SILVERDALE INDUSTRIAL ESTATE SILVERDALE ROAD HAYES
HAYES TOWN 2022 Validated: 23rd Apr
Approval
Details pursuant to the discharge of Condition 20 (Flood Risk Assessment and Drainage Strategy) of planning permission ref. 49261/APP/2024/2904 dated 12-03-2026 (Demolition of the existing building and structures on site, and all other associated site clearance works. Construction of a data centre building (Class B8) with plant at roof level with an emergency generator (1no.) and associated flue (provided within an external compound adjoining the data centre building), sprinkler tank and pumphouse, security guard house, and provision of one kiosk substation and MV Building. The development also comprises the construction of a new access and internal road and circulation areas, footpaths, provision of car and bicycle parking, hard and soft landscaping and other associated works and ancillary site infrastructure.)
UNIT 4, SILVERDALE INDUSTRIAL ESTATE SILVERDALE ROAD HAYES
HAYES TOWN 2022 Validated: 20th Apr
Approval
Details pursuant to the discharge of Condition 21(i) (Contaminated Land) of planning permission ref. 49261/APP/2024/2904 dated 12-03-2026 (Demolition of the existing building and structures on site, and all other associated site clearance works. Construction of a data centre building (Class B8) with plant at roof level with an emergency generator (1no.) and associated flue (provided within an external compound adjoining the data centre building), sprinkler tank and pumphouse, security guard house, and provision of one kiosk substation and MV Building. The development also comprises the construction of a new access and internal road and circulation areas, footpaths, provision of car and bicycle parking, hard and soft landscaping and other associated works and ancillary site infrastructure.)
View all 5 applications for this pattern →

Pattern: “article”

Frequency: 37× higher than normal
37 EDGAR ROAD YIEWSLEY UB7 8HN
YIEWSLEY 2022 Validated: 26th Aug
Undecided
The property is in use as a Class C4 House in Multiple Occupation (HMO) comprising six individual lettable rooms occupied by unrelated residents who share communal kitchen and circulation facilities. The use was fully established and actively occupied prior to the Article 4 Direction coming into force on 11 December 2025, as evidenced by statutory declarations, tenancy agreements, operational invoices, management statements, bank records and written confirmation from the Council's Planning Enforcement Officer following site inspections on 9 July 2025 and 1 September 2025.
55 YORK ROAD NORTHWOOD
NORTHWOOD HILLS 2022 Validated: 18th Jun
Undecided
Confirmation of existing use of first and loft floors as a House in Multiple Occupation (Use Class C4) prior to the borough wide Article 4 Direction coming into force on the 11 December 2025 (Application for a Certificate of Lawful Development for an Existing Use)
64 EAST ROAD WEST DRAYTON MIDDX UB7 9HA
WEST DRAYTON 2022 Validated: 24th Mar
Refusal
Existing use of property as Class C4 HMO prior to the introduction of Article 4 Direction in December 2025 (Application for a Certificate of Lawful Development for an Existing Use)
View all 4 applications for this pattern →

Pattern: “sloped”

Frequency: 29× higher than normal
90 BRIXHAM CRESCENT RUISLIP MIDDLESEX HA4 8TY
RUISLIP MANOR 2022 Validated: 12th Aug
Undecided
Erection of a wrap around extension to the front, side and rear, with a sloped roof to the front, and a flat roof to the side and rear with 3 roof lights, and the erection of a single storey outbuilding to the rear garden.
31A THE AVENUE UXBRIDGE
UXBRIDGE 2022 Validated: 31st Jul
Undecided
Conversion of roof space to habitable use to include hipped to gabled ends, rear dormer with a vent vipe, rooflights to the front, erection of a single storey rear extension, addition of windows to first floor, flat to sloped front porch roof, material change of external finish to brick, all following the demolition of the existing rear conservatory.
14 LADYGATE LANE RUISLIP HA4 7QU
RUISLIP 2022 Validated: 24th Jun
Undecided
Erection of single storey side and rear wraparound extension, a front porch, amendments to fenestration and roof lights to the front, side and rear sloped roof, following the removal of the rear chimney and garden shed. (Description Amended)
View all 7 applications for this pattern →

Pattern: “separate amenity”

Frequency: 28× higher than normal
73 KEITH ROAD HAYES
HAYES TOWN 2022 Validated: 6th Jul
No Further Action(P)
Subdivision of plot into 2 separate amenity spaces for the existing dwellinghouse (1 x 3-bed) and the erection of double storey side and part single storey, part double storey rear extension for an attached dwellinghouse (1 x 2-bed), to include fencing, bin storage, all following the demolition of the existing detached garage.
163 LANSBURY DRIVE HAYES
BELMORE 2022 Validated: 30th Jun
Approval
Change of use from one Class C3 (dwellinghouse) into 2 x self-contained flats (1 x 1-bed and 1 x studio), to include a separate amenity place, cycle storage, and bins. Erection of part single storey, part double storey rear extension, rear dormer, roof lights to the front, and a front porch, following the demolition of an existing outbuilding.
163 LANSBURY DRIVE HAYES
BELMORE 2022 Validated: 24th Apr
Approval
Change of use from one Class C3 (dwellinghouse) into 2 x self- contained flats (1 x 1-bed and 1 x studio), to include a separate amenity place, cycle storage, and bins. Erection of part single storey, part double storey rear extension, rear dormer, roof lights to the front, and a front porch, following the demolition of an existing outbuilding.

Pattern: “certification”

Frequency: 28× higher than normal
29 POTTER STREET NORTHWOOD
NORTHWOOD HILLS 2022 Validated: 2nd Jul
Approval
Conversion of roof space to habitable use to include a rear dormer with Juliette balcony, 2 roof lights, conversion of roof from hip to gable end with new gable end window (Application for a Certification of Lawful Development for a Proposed Development)
72 HAREFIELD ROAD UXBRIDGE
UXBRIDGE 2022 Validated: 29th Jun
Approval
Details pursuant to the discharge of Conditions 7 (proposed privacy screening), 8 (Parking Design and Management Plan), 9 (provision of active electric vehicle charging points), 10 (cycle storage) & 13 (Certification of compliance with Part M4 (2)) of planning permission ref. 25767/APP/2024/2484, dated 07-04-25 (Demolition of existing dwelling and erection of building to provide 3 x 1-bed, 5 x 2-bed, 1 x 3 bed flats with associated parking and amenity space.)
10 WESTFIELD WAY RUISLIP
RUISLIP MANOR 2022 Validated: 18th Jun
Approval
Conversion of roof space to habitable use to include hip to gable extension, rear dormer, gable end window, 2x front roof lights, and an outbuilding to the rear garden (Application for a Certification of Lawful Development for a Proposed Development)

Pattern: “internal road”

Frequency: 23× higher than normal
Hayes Bridge Retail Park and Heathrow Interchange UXBRIDGE ROAD HAYES UB4 0RH
WOOD END 2022 Validated: 11th Aug
Undecided
Details pursuant to the discharge of Condition 16 (Phase 1: LON6 - Construction Environmental Management and Logistics Plan) and 46 (Phase 2: Innovation Hub - Construction Environmental Management and Logistics Plan) of planning permission ref. 78343/APP/2025/719, dated 20.05.2026 (Hybrid planning application for a four-phased redevelopment to deliver a data centre campus comprising of: Phase 1 - Full planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) site access and internal roads including a vehicular and pedestrian link between Uxbridge Road and Bullsbrook Road; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development; Phase 2 - Outline planning permission for (a) an Innovation Hub; (b) hard and soft, green and blue, infrastructure; and (c) other ancillary and auxiliary forms of development (all matters reserved); Phase 3 - Outline planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) internal roads; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development (all matters reserved); and Phase 4 - Outline planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) internal roads; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development (all matters reserved).)
Hayes Bridge Retail Park and Heathrow Interchange UXBRIDGE ROAD HAYES UB4 0RH
WOOD END 2022 Validated: 30th Jul
Undecided
Details pursuant to the discharge of Conditions 21 (Phase 1: LON6 - District Heating Network) and 51 (Phase 2: Innovation Hub - District Heating Network) of planning permission ref. 78343/APP/2025/719, dated 20.05.2026 (Hybrid planning application for a four-phased redevelopment to deliver a data centre campus comprising of: Phase 1 - Full planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) site access and internal roads including a vehicular and pedestrian link between Uxbridge Road and Bullsbrook Road; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development; Phase 2 - Outline planning permission for (a) an Innovation Hub; (b) hard and soft, green and blue, infrastructure; and (c) other ancillary and auxiliary forms of development (all matters reserved); Phase 3 - Outline planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) internal roads; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development (all matters reserved); and Phase 4 - Outline planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) internal roads; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development (all matters reserved).)
Hayes Bridge Retail Park and Heathrow Interchange UXBRIDGE ROAD HAYES UB4 0RH
WOOD END 2022 Validated: 30th Jul
Undecided
Details pursuant to the discharge of Condition 20 (Phase 1: LON6 - Water Infrastructure Details) and 50 (Phase 2: Innovation Hub - Water Infrastructure Details) of planning permission ref. 78343/APP/2025/719, dated 20.05.2026 (Hybrid planning application for a four-phased redevelopment to deliver a data centre campus comprising of: Phase 1 - Full planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) site access and internal roads including a vehicular and pedestrian link between Uxbridge Road and Bullsbrook Road; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development; Phase 2 - Outline planning permission for (a) an Innovation Hub; (b) hard and soft, green and blue, infrastructure; and (c) other ancillary and auxiliary forms of development (all matters reserved); Phase 3 - Outline planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) internal roads; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development (all matters reserved); and Phase 4 - Outline planning permission for (a) a data centre building; (b) energy, power, and water infrastructure; (c) internal roads; (d) site security arrangements and security fencing; (e) hard and soft, green and blue, infrastructure; and (f) other ancillary and auxiliary forms of development (all matters reserved).)
View all 10 applications for this pattern →

Pattern: “part five”

Frequency: 18× higher than normal
WEIR HOUSE, 50 RIVERSIDE WAY UXBRIDGE
UXBRIDGE 2022 Validated: 31st Jul
Undecided
Minor material amendment (s73) to Conditions 2 (Approved Plans), Condition 3 (General Compliance with Supporting Documents) and Condition 9 (Landscaping, Car Parking and Refuse/Cycle Storage) of planning consent reference: 43495/APP/2020/888 dated 17-11-20 (Demolition of existing building and the erection of a part four and part five storey block providing 34 residential units (Use Class C3); associated access and other works including landscaping and amenity space, car and cycle parking and refuse storage). Amendments seek to allow internal and external alterations comprising revised floor layouts and access cores; an increase in the maximum building height of approximately 2 metres; a revised roof form, fenestration, balconies and terraces; additional plant and fire-safety infrastructure; revised refuse and cycle-storage arrangements; a reduction in communal amenity space; a reduction in the cycle storage from 61 to 40 spaces; and an associated change in the affordable housing tenure to 100% social rent, to be secured through a Deed of Variation to the original Section 106 agreement. (AMENDED DESCRIPTION)
WEIR HOUSE, 50 RIVERSIDE WAY UXBRIDGE
UXBRIDGE 2022 Validated: 30th Jul
Undecided
Details pursuant to the discharge of Condition 24 (Bird hazard management plan) of planning permission reference 43495/APP/2020/888 dated 26.01.2022 (Demolition of existing building and the erection of a part four and part five storey block providing 34 residential units (Use Class C3); associated access and other works including landscaping and amenity space, car and cycle parking and refuse storage)
WEIR HOUSE, 50 RIVERSIDE WAY UXBRIDGE
UXBRIDGE 2022 Validated: 30th Jul
Undecided
Details pursuant to the discharge of Condition 18 (Ecological enhancement scheme) of planning permission reference 43495/APP/2020/888 dated 26.01.2022 (Demolition of existing building and the erection of a part four and part five storey block providing 34 residential units (Use Class C3); associated access and other works including landscaping and amenity space, car and cycle parking and refuse storage)
View all 8 applications for this pattern →

Pattern: “apart”

Frequency: 18× higher than normal
Conex House 148 FIELD END ROAD EASTCOTE PINNER HA5 1RJ
EASTCOTE 2022 Validated: 17th Aug
Undecided
Variation of Condition 2 (Approved Plans) of planning permission ref. 78364/APP/2024/2722, dated 04-02-2025 (Change of use from Use Class E to Use Class C3 (dwellinghouses) and the construction of a part three and part four-storey residential apartment with three two-bedroom units and four one-bedroom units, following the demolition of the existing building) to [demolish the sub station and landscaping]
MERCURE LONDON HEATHROW HOTEL SHEPISTON LANE HAYES UB 1LP
PINKWELL 2022 Validated: 19th Jun
Undecided
Demolition of existing car park (with retention of the lower car park level), partial extension of lower ground floor, and erection of 5 storey building providing apart-hotel suites (Class C1), landscaping alterations and associated development.
152-154 UXBRIDGE ROAD HAYES UB4 0JH
BELMORE 2022 Validated: 26th Mar
Approval
Details pursuant to the discharge of Condition 11 (Piling) of planning permission ref. 4482/APP/2022/213, dated 10/10/2024 (Erection of three storey mixed use retail and 9 residential apartments with ancillary parking, amendments to dropped kerbs, refuse and bicycle storage, following the demolition of existing buildings.)
View all 6 applications for this pattern →

Pattern: “combustible”

Frequency: 18× higher than normal
BITTERN HOUSE 28 WRAYSBURY DRIVE YIEWSLEY UB7 7FH
YIEWSLEY 2022 Validated: 23rd Jul
Undecided
External remediation works comprising the localised removal and reinstatement of brickwork and cladding, installation of cavity barriers and fire-stopping measures, and replacement of combustible materials with non-combustible alternatives, with external finishes reinstated on a like for like basis. (Application for a Certificate of Lawful Development for a Proposed Development)
BUSHY LODGE 5 PENNYROYAL DRIVE WEST DRAYTON
WEST DRAYTON 2022 Validated: 29th Jun
Undecided
Replacement of existing combustible decking boards and decking joists with a non-combustible aluminium decking system (Application for a Certificate of Lawful Development for a Proposed Development)
UNION WHARF BENTINCK ROAD WEST DRAYTON MIDDLESEX UB7 7RP
YIEWSLEY 2022 Validated: 22nd May
Approval
Replacement of external materials from spandrel panels to non-combustible alternative (aluminium spandrel panels, replacement of two timber soffits at rear to non-combustible material.

Pattern: “former canteen”

Frequency: 14× higher than normal
FORMER NESTLE FACTORY NESTLES AVENUE HAYES
PINKWELL 2022 Validated: 10th Jun
Approval
Details pursuant to the partial discharge of Condition 31 (Demolition Strategy), (Phase 1, Block H only) of planning permission ref. 1331/APP/2022/2553 dated 05-07-2023 (Partial demolition and redevelopment of the former canteen building to provide a new healthcare facility (Class E(e)), nursery (Class E(f)) and reconfigured residential building (Block H) (Class C3) with a commercial unit at ground floor (Class E), including associated landscaping, access, car parking and other engineering works).
Block H Former Site of Nestle Former Nestle Site Hayes
PINKWELL 2022 Validated: 14th May
Undecided
Deed of Variation to the Section 106 Agreement associated with planning permission ref. 1331/APP/2022/2553 dated 05-07-2023 (Partial demolition and redevelopment of the former canteen building to provide a new healthcare facility (Class E(e)), nursery (Class E(f)) and reconfigured residential building (Block H) (Class C3) with a commercial unit at ground floor (Class E), including associated landscaping, access, car parking and other engineering works). To modify: the Definitions of "Former Canteen Building Obligations", "Offsite Highway Works", "Residential Land Planning Obligation"; Clause 5 The Residential Owner and Industrial Owners Covenants and Enforceability; Schedule 3, Part 1, paragraph 1 Highways Agreement and Offsite Highway Works; Schedule 3, paragraph 3 Former Canteen Building Parking Permit Restrictions; Schedule 8, Part 1, paragraph 1.7 - Air Quality Mitigation; Schedule 8, Part 2, paragraphs 3-5 Carbon Offset Fund; Schedule 9, Part 2 Former Canteen Building Travel Plan; Schedule 9, Part 3 Travel Plan Bond; Schedule 16C Former Canteen Building; Appendix 2 S106 Plans.
CANTEEN BUILDING FORMER NESTLE FACTORY NESTLES AVENUE HAYES
PINKWELL 2022 Validated: 23rd Apr
Approval
Details pursuant to the partial discharge of Condition 16 Part i (Contamination) (Block H only) of planning permission ref. 1331/APP/2022/2553 dated 05-07-2023 (Partial demolition and redevelopment of the former canteen building to provide a new healthcare facility (Class E(e)), nursery (Class E(f)) and reconfigured residential building (Block H) (Class C3) with a commercial unit at ground floor (Class E), including associated landscaping, access, car parking and other engineering works).
View all 7 applications for this pattern →

Pattern: “external appearance”

Frequency: 14× higher than normal
8 WARREN ROAD ICKENHAM
ICK/HAM & S HF/D 22 Validated: 24th Jun
Undecided
Variation of Condition 2 (Approved Plans) of planning permission ref. 23271/APP/2025/1515, dated 20-08-2025 (Demolition of existing two storey detached dwelling house and erection of two storey detached dwelling house with habitable rooms in loft space.) to amend the external appearance of the dwelling, including the introduction of square front bay windows, a revised front porch, alterations to the fenestration and rear elevation, and associated minor changes to the building footprint and roof height (amended plans and description 30.07.26).
10 MILTON ROAD ICKENHAM
ICK/HAM & S HF/D 22 Validated: 23rd Jun
Approval
Alterations to external appearance of property including replacement of flat roofs above the first floor side extension and front facing dormer with pitched roofs, installation of roof lights, and application of render to external walls.
Northwood And Pinner Community Hospital PINNER ROAD NORTHWOOD HA6 1TH
NORTHWOOD HILLS 2022 Validated: 21st Apr
Approval
Non-material amendment to planning permission ref. 23658/APP/2023/2980 dated 11-10-2024 (Minor Material Amendment (S73) to Conditions 2 (Approved Plans), 3 (Approved Documents) and 23 (Landscaping Scheme for Health Centre Development) of planning permission ref. 23658/APP/2021/1296, granted 31-08-2023 for: Partial demolition, refurbishment and extension of the existing Cottage Hospital to provide a state of the art health centre and the comprehensive redevelopment of the remaining Site to provide residential (Use Class C3) accommodation and ancillary works including car parking, cycle parking, landscaping and associated works (Phased Development)) to omit four windows at Level 01 located behind the acoustic screen and adjacent to external plant, together with associated updates to the approved drawings to regularise the floor plans and elevations, with no change to the external appearance of the building.

Pattern: “amend fenestration”

Frequency: 13× higher than normal
23 DAYMER GARDENS EASTCOTE PINNER
NORTHWOOD HILLS 2022 Validated: 13th Aug
Undecided
Variation of Condition 2 (approved plans) of planning permission ref. 45997/APP/2025/1729, dated 13-08-25 (Variation of Condition 2 (approved plans) of planning permission ref. 45997/APP/2025/335, dated 07-04-25 (Erection of a part two storey part single storey rear and side extensions, following the demolition of existing conservatory and detached garage) to install 4no. roof lights) of planning permission ref. 45997/APP/2025/335 (Erection of a part two storey part single storey rear and side extensions, following the demolition of existing conservatory and detached garage.) to amend fenestration and internal layout.
2 WOODCROFT CRESCENT HILLINGDON UB10 9JA
HILLINGDON EAST 2022 Validated: 31st Mar
Refusal
Non-material amendment to planning permission ref. 75874/APP/2024/3369, dated 05-03-2025 (Erection of a part single storey, part two storey extension to the the side and rear. Erection of a detached outbuilding.) to amend fenestration, add roof lights and add render to exterior walls.
14 LARNE ROAD RUISLIP
RUISLIP 2022 Validated: 25th Mar
Approval
Variation of Condition 2 (Approved Plans) of planning permission ref. 57311/APP/2023/322, dated 09-03-2023 (Demolition of an existing 2-bed bungalow and erection of a new 4-bedroom bungalow with a habitable roof space, including side dormer, raising the ridge of the main roof, roof lights and solar panels.) to amend fenestration.

Pattern: “which includes”

Frequency: 12× higher than normal
BRAINTREE INDUSTRIAL ESTATE BRAINTREE ROAD RUISLIP
SOUTH RUISLIP 2022 Validated: 13th Aug
Undecided
Non-material amendment to planning permission ref. 7215/APP/2020/2901 (as amended), dated 03-12-20 (Request for approval of Plans and specifications under condition imposed by Schedule 17 to the High Speed Rail (London - West Midlands) Act 2017 relating to a head house (South Ruislip Vent Shaft Head House) compound, which includes the vent shaft headhouse building, the fan room building, two ventilation stacks, road vehicle parking, an Autotransformer Station, earthworks for retaining walls and associated fencing and artificial lighting units) to allow for the provision of additional compound security fencing, minor earthworks near this additional fence to direct surface water to the drainage retention basin, and the relocation of a lighting column.
49 GLEDWOOD AVENUE HAYES
BELMORE 2022 Validated: 28th Jul
Undecided
Change of use from Class C3 (Dwellinghouse) to Class C4 (HMO for up to 5 persons), which includes the installation of wooden fencing to the rear for rear amenity, bike and bin storage
HARTFIELD PLACE HIGH STREET NORTHWOOD
NORTHWOOD 2022 Validated: 14th Jul
Undecided
Change of use from Class E(g)(i) to Class C3 (2 x dwellinghouses and 3 x flats), which includes the demolition of the existing single storey commercial office building, and the erection of 3 new flats (1 x 3-bed and 2 x 1-bed) and two dwellinghouses (2 x 2-bed) with associated car parking, cycle and bin storage.
View all 4 applications for this pattern →

Pattern: “all following”

Frequency: 12× higher than normal
35 MOOR PARK ROAD NORTHWOOD
NORTHWOOD 2022 Validated: 4th Aug
Undecided
Erection of single storey part rear, part side extension with a pitched roof, and an outbuilding to the rear garden, all following the demolition of an existing rear conservatory.
31A THE AVENUE UXBRIDGE
UXBRIDGE 2022 Validated: 31st Jul
Undecided
Conversion of roof space to habitable use to include hipped to gabled ends, rear dormer with a vent vipe, rooflights to the front, erection of a single storey rear extension, addition of windows to first floor, flat to sloped front porch roof, material change of external finish to brick, all following the demolition of the existing rear conservatory.
15 COLLINS DRIVE RUISLIP
EASTCOTE 2022 Validated: 31st Jul
Undecided
Conversion of roof space to habitable use to include hip to gable extension, rear dormer with Juliette balcony, 3x front facing rooflights, erection of a part single part double storey rear extension, front porch, addition of render insulation to external walls, and a patio to the rear, all following the demolition of the existing rear garage, front porch and chimney.
View all 14 applications for this pattern →